Restricted content
Project Management
Standard Document #P11
Suppliers of catering equipment are often required to provide fire protection systems and regularly have problems in ensuring that connections are made between the controls of the fire protection system and other systems, such as fire alarms, building management systems, kitchen extract fans and fuel supplies (which often need to be shut down in the event of a fire).
Published April 2018 / Re-branded June 2020
Download Link:
Standard Document P11 - Interface between fire fighting systems and other systems in commercial kitchens
Restricted content
Project Management
Standard Document #P08
This document should be read in conjunction with the following Standard Documents:
Standard Document #P04 Defects List
Standard Document #P07 Project Warranty Schedule
Published March 2017 / Re-branded June 2020
Download Link:
Standard Document P8 - Project Handover Certificate
Restricted content
Project Management
Standard Document #P07
This document should be used in conjunction with the following Standard Document:
Standard Document #P08: Project Handover Certificate
Published March 2017 / Re-branded June 2020
Download Link:
Standard Document P7 - Project Warranty Schedule
Restricted content
Project Management
Standard Document #P05
ceda has prepared two standard documents for risk assessments for both Project design and Reactive breakdown, service and maintenance calls by service engineers.
Published December 2017 / Re-branded June 2020
Download Link:
Standard Document P5 - Guidance on the use of Risk Assessments
Restricted content
Project Management
Standard Document #P04
This document should be used in conjunction with the following Standard Document:
Standard Document #P08: Project Handover Certificate
Published March 2017 / Re-branded June 2020
Download Link:
Standard Document P4 - Defects List
Restricted content
Project Management
Standard Document #P03
All Risk Assessments issued by ceda as standard documents are not intended to provide a “one size fits all” solution but should be used as a template and the hazards and control measures indicated are just examples and should be considered as to whether they are appropriate to the specific case that the member is working on.
Published January 2018 / Re-branded June 2020
Download Link:
Standard Document P3- Design Risk Assessment
Restricted content
Project Management
Standard Document #P01
This document should be read in conjunction with the Standard Document #P02: Risk Assessment for Delivery and Installation of Catering Equipment
Published January 2018 / Re-branded June 2020
Download Link:
Standard Document P1 - Method statement for Delivery and Installation of Commercial Catering Equipment