Coppa Club
Sprint Group
Design and install kitchen including dishwashing area, dry storage areas and chiller and freezer cold rooms. Design and install stainless steel under-bar construction to fit within timber front bar structure installed by main contractor.
Client was very satisfied with the new installation, which was a new departure for them, with a new supplier team and new specifications of equipment etc more akin to their operation. This has opened the door for Sprint for more new sites, 1-off of which was delivered earlier this summer in Clifton, Bristol, and another in Putney due to install October 2021. Plus we are looking at major refits/upgrades to existing sites kitchens and bars.