Restricted content
Day: April 23, 2020
Standard Document #P10
Equipment Commissioning Sheet
Published February 2016 / Re-branded June 2020
Download Link:
Standard Document P10 - Commissioning Sheet
Restricted content
Day: April 23, 2020
Standard Document #P06
This document is part of a suite of documents developed to provide members with standards that members are encouraged to adopt with the ultimate objective for them to become industry standards.
Published August 2019 / Re-branded June 2020
Download Link:
Standard Document P6 - Pre-Installation Site Survey Checklist
Restricted content
Day: April 23, 2020
Standard Document #P11
Suppliers of catering equipment are often required to provide fire protection systems and regularly have problems in ensuring that connections are made between the controls of the fire protection system and other systems, such as fire alarms, building management systems, kitchen extract fans and fuel supplies (which often need to be shut down in the event of a fire).
Published April 2018 / Re-branded June 2020
Download Link:
Standard Document P11 - Interface between fire fighting systems and other systems in commercial kitchens
Restricted content
Day: April 23, 2020
Standard Document #P08
This document should be read in conjunction with the following Standard Documents:
Standard Document #P04 Defects List
Standard Document #P07 Project Warranty Schedule
Published March 2017 / Re-branded June 2020
Download Link:
Standard Document P8 - Project Handover Certificate
Restricted content
Day: April 23, 2020
Standard Document #P07
This document should be used in conjunction with the following Standard Document:
Standard Document #P08: Project Handover Certificate
Published March 2017 / Re-branded June 2020
Download Link:
Standard Document P7 - Project Warranty Schedule
Health & Safety Webinars
Health & Safety Webinars
We are launching a series of Health & Safety Webinars over the coming weeks to continue the Learning, Education and Development of you and your staff at this time.
The topics listed below will take the form of a one hour, live and interactive webinar with Health & Safety Consultant Tim Knowles – all free of charge to ceda Members and Partners.
Tim has presented at ceda Conferences in the past and has worked with a number of companies in our sector.
Please contact the ceda office indicating in the subject line which topic you would like to participate in, then we will arrange accordingly and send out invitations to you.
Please share with your teams, even if furloughed, so that we can maximise uptake.
Up-coming Health & Safety Webinar topics:
- Health and Safety Law in Court – Trends In Regulation
- Practical Risk Mitigation in Catering Facilities Design
- Accident Reporting – What NOT to do
- Work at Height – Common Mistakes
- Vibration and Noise – The Basics
- Risk Assessment – The Basics
- Asbestos – A Retail Experience
- Fire Considerations In Design
- Safety Culture – How to create and maintain one
- Young People in the Workplace
- Accident Investigation – Legal Privilege
- CDM and how it affects you
Restricted content
Day: April 23, 2020
Standard Document #P05
ceda has prepared two standard documents for risk assessments for both Project design and Reactive breakdown, service and maintenance calls by service engineers.
Published December 2017 / Re-branded June 2020
Download Link:
Standard Document P5 - Guidance on the use of Risk Assessments
Restricted content
Day: April 23, 2020
Standard Document #P04
This document should be used in conjunction with the following Standard Document:
Standard Document #P08: Project Handover Certificate
Published March 2017 / Re-branded June 2020
Download Link:
Standard Document P4 - Defects List
Restricted content
Day: April 23, 2020
Standard Document #P03
All Risk Assessments issued by ceda as standard documents are not intended to provide a “one size fits all” solution but should be used as a template and the hazards and control measures indicated are just examples and should be considered as to whether they are appropriate to the specific case that the member is working on.
Published January 2018 / Re-branded June 2020
Download Link:
Standard Document P3- Design Risk Assessment