{"id":11346,"date":"2025-05-20T15:27:31","date_gmt":"2025-05-20T14:27:31","guid":{"rendered":"https:\/\/ceda.co.uk\/conference2025\/?p=11346"},"modified":"2025-05-20T15:27:55","modified_gmt":"2025-05-20T14:27:55","slug":"margo-sebbs","status":"publish","type":"post","link":"https:\/\/ceda.co.uk\/conference2025\/margo-sebbs\/","title":{"rendered":"Margo &amp; Sebbs"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">Instock Group<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We are very pleased to have played such a significant part in the successful design, delivery and completion of the project for Margo &amp; Sebbs. The project, initiated with a clear vision and collaborative planning, has achieved major milestones. Delivering two bespoke kitchens, three bars and all HVAC to a high standard driven from the extensive design process with the client has been a joy and pleasure to be involved with.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Achievements<br>All deliverables met the high standards expected by Jonathan and the client team for both Margo &amp; Sebbs, with a strong emphasis on ergonomics &amp; future maintenance in mind<br>Maintained consistent communication and transparency throughout the project to ensure alignment with the client\u2019s teams goals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Outcomes<br>Positive client feedback throughout which laid a solid foundation for future collaboration. On completion, the Prois team commenced the design process for the clients\u2019 teams next project (Ox &amp; Finch, Glasgow).<br>Project delivered by the team at Prois whilst ensuring all contractors on site were communicated with daily to ensure the best possible outcome for all challenges faced throughout the delivery and installation process whilst focusing on efficiency and strong project management.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finally<br>Our team evolved around a client with very specific requirements and needs, for that I am extremely grateful for and very proud to have represented &amp; lead our team throughout the full process of designing and delivering the project at Margo &amp; Sebbs<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"11347\" data-src=\"https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-768x1024.jpg\" alt=\"\" class=\"wp-image-11347 lazyload\" data-srcset=\"https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-768x1024.jpg 768w, https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-225x300.jpg 225w, https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-150x200.jpg 150w, https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-18x24.jpg 18w, https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-27x36.jpg 27w, https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001-36x48.jpg 36w, https:\/\/ceda.co.uk\/conference2025\/wp-content\/uploads\/sites\/15\/2025\/05\/Kitchen-Image_page-0001.jpg 1080w\" data-sizes=\"(max-width: 768px) 100vw, 768px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 768px; --smush-placeholder-aspect-ratio: 768\/1024;\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Instock Group We are very pleased to have played such a significant part in the successful design, delivery and completion of the project for Margo &amp; Sebbs. The project, initiated with a clear vision and collaborative planning, has achieved major milestones. Delivering two bespoke kitchens, three bars and all HVAC to a high standard driven&hellip;<\/p>\n","protected":false},"author":1,"featured_media":11347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-11346","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-over-500k"],"_links":{"self":[{"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/posts\/11346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/comments?post=11346"}],"version-history":[{"count":0,"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/posts\/11346\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/media\/11347"}],"wp:attachment":[{"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/media?parent=11346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/categories?post=11346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ceda.co.uk\/conference2025\/wp-json\/wp\/v2\/tags?post=11346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}